Stalled sewer project delays opening of road until May
NORTH GATE ROAD
Late last year, the sewer construction on North Gate Road was suspended as a result of unforeseen soil conditions, which would require a project redesign, according to the 405 widening contractor, OC405. The project called for a sewer line to be built underneath the 405 Freeway.
The City of Seal Beach was recently informed by OC405 that the redesign of the freeway sewer crossing