Posted on

Bike lane gap closure project

CITY OF SEAL BEACH

The City of Seal Beach continues the expansion of bike lane paths throughout the city.

As part of the grant on Active Transportation Program (ATP), Class II bike lanes will be constructed on Lampson Avenue between Basswood Street and Seal Beach Boulevard, which will connect to the already existing bike lane along Lampson Avenue from Basswood Street going east.

Class II bike lanes are designed as an on-road bicycle lane, and are typically 5-6’ wide.

The modifications will also include bike lane signage, roadway pavement, replacement of curb ramps, traffic signals, landscaping, and limited roadway changes.

The construction will last from April 8 through August. “No parking” signs, lane restrictions, reduced speed, water trucks and construction noise should be expected.

Leave a Reply

Your email address will not be published. Required fields are marked *

LATEST NEWS