Posted on

• Start pool and spa ….

• Start pool and spa …. • Start pool and spa ….

• Start pool and spa plumbing .

The pool has been closed since November 2019, when potentially catastropic defects were uncovered in the 1960s-era facility.

The project that started as a simple remodel soon morphed into a full-blown reconstruction in the name of safety.

The project coincided with the coronavirus epidemic, which has delayed construction, parts procurement and other facets of the job.

The facility will boast a pool with five swimming lanes, a 30-by-30-foot activity area with a volleyball net, a 9-by-25-foot spa, new locker rooms and a lounge area in a reconfigured space to maximize potential.

Leave a Reply

Your email address will not be published. Required fields are marked *

LATEST NEWS